Documentation and grid connection
Documentation for a grid connection or power increase
For a new house or a power increase you need an indoor installation in good order and the documentation that goes with it. We prepare the installation and the technical part of the application file, and explain the steps required by the grid operator.
In short
Who does what for a grid connection
The service connection, meaning the link from the grid to the meter, is built by the grid operator, based on the technical grid connection approval (ATR, aviz tehnic de racordare) it issues. We take care of the indoor installation after the meter and its technical documentation.
We prepare the panel diagram and the test report (PRAM, the Romanian term for earthing and installation testing) and tell you which other documents you will be asked for, depending on your situation.
For a power increase, for example when you add an induction hob, air conditioning or other high-power appliances, we check whether the electrical panel and circuits can handle it and adapt them where needed.
What is included
- Analysis of consumption and the power required
- Adapting the electrical panel and circuits
- Single-line diagram of the panel
- Test report (PRAM)
- Technical documentation of the indoor installation
- Explanation of the steps required by the grid operator
When you need it
Situations where we help you with the paperwork
New house
Connecting to the grid for the first time.
Power increase
Your current power allowance is no longer enough.
New high-power appliances
Induction hob, air conditioning, water heater.
Commercial space
A change in how a space is used or in its consumption.
After rewiring
New documentation for the new installation.
Documents for your application
Diagram and PRAM test report for the electricity supplier or grid operator.
How we work
From photos to the finished job
You contact us
On WhatsApp, by phone or through the form. Tell us what you need done and where.
We assess from photos or video
You send us photos or a short video. We only come on site if needed.
You get a written quote
Work, materials and timeframe, clearly set out before we start.
We do the work and test it
We work cleanly, test everything and hand over the documentation.
Price
How much the documentation costs
The price depends on what needs to be checked and adapted in the installation. Tell us what you have been asked for in your application file and we will give you a written quote.
All rates- Labour from 250 lei + VAT per hour per electrician (302.50 lei incl. VAT)
- A minimum of one hour is charged
- Materials and travel are invoiced separately, itemised in the written quote
- The assessment from photos or video and the quote are free
- Payment is in lei (RON)
Frequently asked questions
Questions about grid connection and power increase
Who builds the service connection to the grid?
The service connection is built by the grid operator, based on the technical grid connection approval (ATR). We take care of the indoor installation after the meter and its technical documentation.
Which documents do you prepare for the application?
The panel diagram and the test report (PRAM), plus the technical documentation of the indoor installation. You get the full list of required documents from the grid operator; we help you understand it.
Do I need a power increase for an induction hob?
It depends on your current power allowance, the hob and what other appliances you have. We work out the power required and tell you whether your current allowance is enough or you need an increase.
Related services
You may also be interested in
PRAM electrical testing
Testing of the earthing system and the installation, with a test report.
DetailsElectrical panels
Installation, upgrade and relocation, with residual current protection.
DetailsNew electrical installations
New houses and apartments, from cable routes to switches and sockets.
DetailsDo you need documents for a grid connection?
Send us a few photos and we will get back to you with a written quote, free of charge.